Install the T-Connect
So your T-Connect's just arrived — here's how to fit it.
It arrives already set up for your network, so there's nothing to configure before you start. Fitting takes about 20 minutes of isolated time per machine.
What's in the box
- The T-Connect and its antenna
- A DC power cable for the machine's 24 V supply
- Current clamps, if you're measuring with current sensing
- Plugs for the digital inputs, if you're using them
- Velcro pads for mounting
Fitting it, in order
- Power and mounting — wire the T-Connect into the machine's 24 V supply and find it a spot in the cabinet.
- Connect it to the machine — always with current sensing or digital inputs (or both). Not sure which? See Choose how to read your machine.
- Current sensing — a clamp around the spindle supply. Works on any machine.
- Digital inputs — a running signal and part counts wired from the machine.
- Add a machine connection (optional) — connect to the control (Fanuc, Mazak, Siemens) for the program name, part count and feed override.
- Finish and check — below.
Finish and check
- Close the machine cabinet.
- Turn the machine on.
- Watch the two LEDs next to the sensor jacks. When both are on and solid, the T-Connect is online and sending data.
If they aren't both solid after a few minutes, see If your T-Connect isn't connecting.
Need help?
Email support@trackmymachines.com and we'll walk you through it.